Talboys Aluminum Pro Stirrer, 230V Cat No # 984TA7ASTEUP
The Talboys Aluminum Pro Stirrer is designed for applications that require exceptional accuracy, stability, and repeatability. This hotplate stirrer offers a closed loop PID microprocessor for speed control. This unit has an easy-to-use control panel, with separate LED displays for speed and time to allow the user to view all settings at once. An innovative safety system helps protect the user and sample. This stirrer also features a low profile design that takes up minimal space and fits easily into fume hoods.
The Talboys Aluminum Pro Stirrer, 230V Cat No # 984TA7ASTEUP includes:
- > Power Cord
- > Operator's Guide
- > Full 180 Day Parts and Labor Warranty
Talboys Aluminum Pro Stirrer, 230V Cat No # 984TA7ASTEUP Specifications
| Stirrer Speed |
60 to 1,600 RPM |
|
Platform Size |
7 x 7 in (17.8 x 17.8 cm) |
|
Electrical Requirements |
230V, 50/60Hz, 0.5A, 50W |
| Platform Material | Aluminum |
| Speed Stability | 2% |
| Timer | 1 sec to 160 hrs |
| Maximum Capacity | 2500 ml |
- Inspect Display and Replace Any Dim/Dead Pixels (If Applicable).
- Inspect Ceramic Top for Any Cracks and Replace If Necessary.
- Inspect Functionality of All Buttons/Knobs.
- Use Magnetic Stir Bar Alongside NIST Tachometer to Confirm RPM of Internal Motor (If Applicable).
- Inspect Internal Wiring Inside Case.
- Clean Internal Parts and Vent Any Internal Debris.
- Check Feet to Confirm Plate Sits Properly Balanced.
- Replace All Parts That Were Removed on Internal Inspections.
- Confirm Temperature with NIST Traceable Temperature Probe (If Applicable).
- Ensure Cosmetics Are Acceptable.
Technician Inspection and Recertification Checklist: Hot Plate Stirrers
The Following Checklist Is to Be Performed on All Incoming and Outgoing Equipment| Task | Completed? | Remarks? |
| Inspect Display and Replace Any Dim/Dead Pixels (If Applicable) | Completed | |
| Inspect Ceramic Top for Any Cracks and Replace If Necessary | Completed | |
| Use Magnetic Stir Bar Alongside NIST Tachometer to Confirm RPM of Internal Motor (If Applicable) | Completed | |
| Inspect Internal Wiring Inside Case | Completed | |
| Clean Internal Parts and Vent Any Internal Debris | Completed | |
| Check Feet to Confirm Plate Sits Properly Balanced | Completed | |
| Replace All Parts That Were Removed on Internal Inspections | Completed | |
| Confirm Temperature with NIST Traceable Temperature Probe (If Applicable) | Completed |
Talboys Aluminum Pro Stirrer Manual
Click Here to View all the Technical Specs for the Talboys Aluminum Pro Stirrer


Click Here to View the Technical Specs for the Talboys Hotplate Stirrer