Corning PC 310 Magnetic Stirrer
The Corning PC 310 Magnetic Stirrer is a compact and efficient tool designed to meet the mixing needs of any laboratory. This stirrer features a variable speed range from 60 to 1,110 RPM, allowing for precise control over the stirring process. The platform size of 6 x 7.5 inches (15.2 x 19.1 cm) provides ample space for various container sizes, making it versatile for different types of solutions and volumes. Its robust construction ensures durability and reliable performance, making it an essential device for daily laboratory use
All of our equipment will be fully tested to perform at factory specifications before being shipped.
The Corning PC 320 Hot Plate Stirrer includes:
- Power Cord
- Full 180 Day Parts and Labor Warranty
Corning PC 310 Magnetic Stirrer Specifications
| Stirrer Speed | 60 to 1,110 RPM |
| Platform Size | 6 x 7.5 in. (15.2 x 19.1 cm) |
| Electrical Requirements | 120V, 50/60Hz, 20W |
- Inspect Display and Replace Any Dim/Dead Pixels (If Applicable).
- Inspect Ceramic Top for Any Cracks and Replace If Necessary.
- Inspect Functionality of All Buttons/Knobs.
- Use Magnetic Stir Bar Alongside NIST Tachometer to Confirm RPM of Internal Motor (If Applicable).
- Inspect Internal Wiring Inside Case.
- Clean Internal Parts and Vent Any Internal Debris.
- Check Feet to Confirm Plate Sits Properly Balanced.
- Replace All Parts That Were Removed on Internal Inspections.
- Confirm Temperature with NIST Traceable Temperature Probe (If Applicable).
- Ensure Cosmetics Are Acceptable.
Technician Inspection and Recertification Checklist: Hot Plate Stirrers
The Following Checklist Is to Be Performed on All Incoming and Outgoing Equipment| Task | Completed? | Remarks? |
| Inspect Display and Replace Any Dim/Dead Pixels (If Applicable) | Completed | |
| Inspect Ceramic Top for Any Cracks and Replace If Necessary | Completed | |
| Use Magnetic Stir Bar Alongside NIST Tachometer to Confirm RPM of Internal Motor (If Applicable) | Completed | |
| Inspect Internal Wiring Inside Case | Completed | |
| Clean Internal Parts and Vent Any Internal Debris | Completed | |
| Check Feet to Confirm Plate Sits Properly Balanced | Completed | |
| Replace All Parts That Were Removed on Internal Inspections | Completed | |
| Confirm Temperature with NIST Traceable Temperature Probe (If Applicable) | Completed |


