|
|
|
|
Zymark TurboVap LV Evaporator
Water Bath Temperature Range Ambient to 90°C
Gas Consumption 1 CFM Per Row of Nozzles at 15 psi
- High-speed, small volume sample concentrator, ideal for efficient laboratory sample preparation
- Offers automated, unattended operation, replacing conventional time-consuming techniques
- Compatible with a range of interchangeable tube racks, accommodating volumes from 1.5 mL to 60 mL
- Significantly faster processing: 10x than centrifugal evaporators, 3x than hot blocks, 2x than conventional N2 blow down
- Has a capacity for 50 tubes, facilitating substantial sample processing
- Features gas consumption of 1 cfm per row of nozzles at 15 psi, sourced from 60 to 100 psi
- Adjustable water bath temperature range from ambient to 90°C for precise control
The Zymark TurboVap LV Evaporator is a high speed, small volume sample concentrator. It is an efficient alternative to the inconvenient setup, constant monitoring and long evaporation times that are characteristic of conventional techniques - with the added convenience of unattended, automatic operation. The TurboVap LV can simultaneously process up to 50 samples in many popular test tube, centrifuge tube, and micro-centrifuge tube sizes. This evaporator uses a gas vortex shearing action for high evaporation rates regardless of sample height in tubes. The TurboVap LV is ten times faster than centrifugal evaporators, three times faster than hot blocks, and two times faster than conventional N2 blow down. Choice of tube rack for 1.5/2.0ml vials, 1.5/2.0ml flip cap tubes, 9ml tubes, 12ml tubes, 15ml conical tubes, or 25ml tubes are available. The TurboVap LV is commonly used for evaporation of solvents following solid phase extraction clean-up of drug samples or pesticide extracts. All of our equipment will be fully tested to perform at factory specifications before being shipped.
The Zymark TurboVap LV Evaporator includes:
- > Tube Rack
- > Power Cord
- > Operator's Manual
- > Full 180 Day Parts and Labor Warranty
Zymark TurboVap LV Evaporator Specifications
Tube Capacity
|
50 tubes
|
Gas Consumption
|
1 cfm per row of nozzles at 15 psi (from a source capable of
supplying 60 to 100 psi)
|
Water Bath Temperature Range
|
Ambient to 90C
|
Gas Regulator and Gauge Range
|
0 to 30 psi
|
Overall Dimensions (H x W x D)
|
11.9 x 21.2 x 11.9 in
|
Electrical Requirements
|
100-120V, 50-60Hz
|
TurboVap LV Manual
- Verify internal power supply output for correct voltage to ensure stable and accurate performance
- Confirm fuse holder is secured firmly, preventing movement or disconnection
- Inspect glass window for any cracks or chips, maintaining structural integrity and visibility
- Assess power-up diagnostics, display, and push wheel buttons for full functionality
- Ensure pressure gauge and regulator are operating accurately and within specified ranges
- Test and align all nozzle manifolds, clearing any blockages to optimize spray performance
- Check all tubing for leaks, confirming secure attachment to manifolds to prevent pressure loss
- Verify all control panel connections are secure, with no frayed or torn wiring that could impact safety
- Confirm fan operation to maintain appropriate internal cooling, replacing if performance is inadequate
- Test evaporative cooling functionality, ensuring performance below ambient temperature
- Test heating bath accuracy, confirming precise temperature alignment with set points
- Verify PSI stability, confirming that pressure is steady and adjustable as needed
- Ensure cosmetic condition is within standards, free from damage impacting function or appearance
Technician Inspection and Recertification Checklist: Blowdown Evaporators
The Following Checklist Is to Be Performed on All Incoming and Outgoing Equipment
Task
|
Completed?
|
Remarks?
|
Verify internal power supply output voltage
|
Completed
|
|
Confirm fuse holder is secured
|
Completed
|
|
Inspect glass window for cracks or chips
|
Completed
|
|
Assess power-up diagnostics, display, and push wheel buttons
|
Completed
|
|
Ensure pressure gauge and regulator functionality
|
Completed
|
|
Test and align all nozzle manifolds, clear blockages
|
Completed
|
|
Check tubing for leaks and secure attachment to manifolds
|
Completed
|
|
Verify secure control panel connections and check wiring
|
Completed
|
|
Confirm fan operation, replace if needed
|
Completed
|
|
Test evaporative cooling below ambient temperature
|
Completed
|
|
Confirm heating bath temperature accuracy
|
Completed
|
|
Verify PSI stability and adjustability
|
Completed
|
|
Ensure cosmetic condition meets standards
|
Completed
|
|
To View More of Our Recertification Protocol Click Here
|
|
|
|
|
|
|