|
|
|
|
VWR Analog Multi-Tube Vortexer, Cat. #: 58816-115
The VWR Analog Multi-Tube Vortexer, Cat. #: 58816-115 offers a robust speed range of 1,200 to 2,400 RPM with a precise speed accuracy of ± 25 RPM, making it ideal for various mixing applications. It features a compact 3.6mm orbit for effective vortexing and includes a convenient timer that can be set from 0 to 60 seconds to accommodate different workflow needs. This vortexer can handle a maximum load of up to 10 lb. (4.5 kg), ensuring versatility across multiple tube formats. User control is enhanced with a rocker switch for selecting run, standby, or timer modes and two variable dials (1 to 10 markings) for adjusting speed and time, providing tailored operation for diverse laboratory requirements.
All of our equipment is in excellent condition and will be fully tested to perform at factory specifications before being shipped.
The VWR Analog Multi-Tube Vortexer, Cat. #: 58816-115 includes:
- > Power Cord
- > Operator's Manual
- > Full 180 Day Parts and Labor Warranty
VWR Analog Multi-Tube Vortexer, Cat. #: 58816-115 Specifications
Speed Range
|
1,200 to 2,400 RPM
|
Speed Accuracy
|
± 25 RPM
|
Orbit
|
3.6mm (0.14 in.)
|
Timer
|
0 to 60 seconds
|
Maximum Load
|
10 lb. (4.5 kg)
|
Dimensions (L x W x H)
|
9.5 x 15.1 x 16 in. (24.1 x 38.4 x 40.6 cm)
|
Weight
|
45 lb. (20.4 kg)
|
Electrical Requirements
|
115V, 50/60Hz
|
- Verify power supply and PCB output correct, stable voltages across all required circuits
- Confirm the correct platform head is installed according to specifications
- Inspect the display for dim or dead pixels, replacing any compromised sections to maintain clear visibility
- Confirm full functionality of all buttons and knobs, ensuring accurate input response
- Verify that touch, pulse, and continuous modes operate fully and as intended
- Inspect all internal wiring for breakages, tears, or wear, replacing any underperforming components to ensure reliability
- Disassemble and thoroughly clean the internal casing to remove any accumulated debris
- Check that the feet are intact and confirm the vortexer is properly balanced on a flat surface
- Conduct a comprehensive cosmetic inspection to ensure all exterior surfaces meet quality standards
Technician Inspection and Recertification Checklist: Vortexer
The Following Checklist Is to Be Performed on All Incoming and Outgoing Pieces of Equipment
Task
|
Completed?
|
Remarks?
|
Verify power supply and PCB output stable, correct voltages across circuits
|
Completed
|
|
Confirm correct platform head is installed according to specifications
|
Completed
|
|
Inspect display for dim or dead pixels; replace compromised sections for clarity
|
Completed
|
|
Confirm functionality of all buttons and knobs for accurate input response
|
Completed
|
|
Verify full operation of touch, pulse, and continuous modes as intended
|
Completed
|
|
Inspect internal wiring for damage; replace underperforming components for reliability
|
Completed
|
|
Disassemble and clean internal casing to remove accumulated debris
|
Completed
|
|
Check feet for integrity and confirm vortexer is balanced on flat surface
|
Completed
|
|
Conduct comprehensive cosmetic inspection to ensure quality of exterior surfaces
|
Completed
|
|
To View More of Our Recertification Protocol Click Here
|
|
|
|
|
|
|