|
|
|
|
Troemner VX-2400 Multi-Tube Vortexer
The Troemner VX-2400 Multi-Tube Vortexer has a conveniently angled front panel which features rocker switch for run, time, and standby modes. The analog VX-2400 can process up to 50 samples at a time and featues continuous or timed operation. This multi-tube vortexer is ideal for a number of applications including: s uspensions, high throughput testing in clinical, environmental, and chemistry labs.
All of our equipment is fully tested to perform at factory specifications before being shipped.
The Troemner VX-2400 Multi-Tube Vortexer includes:
- > Power Cord
- > Full 180 Day Parts and Labor Warranty
Troemner VX-2400 Multi-Tube Vortexer Specifications
Control Type
|
Analog
|
Electrical Requirements
|
120V, 50/60 Hz, 5A, 100W
|
Speed Range
|
1200 to 2400 rpm
Maximum speed will vary depending on load
|
Controls
|
Run/Standby/Timer Rocker Switch
Speed Knob: Variable 1 to 10 Dial Marks for Speed and Time
|
Capacity
|
10 lbs (4.5kg)
|
Duty Rating
|
Continuous Duty
|
Dimensions
|
9.5 x 15.1 x 16"
(24.1 x 38.4 x 40.6cm)
|
Tray Dimensions
|
7.25 x 12.25"
(18.4 x 31.1 cm)
|
Operating Conditions
|
Unit can be run in conditions from 18 to 33C (64 to 91F), 20% to
85% relative humidity, non-condensing.
|
Orbit
|
3.6 mm
|
Applications
|
Suspensions, high throughput testing in clinical, environmental, and
chemistry labs
|
Certifications
|
UL Listed
|
- Verify power supply and PCB output correct, stable voltages across all required circuits
- Confirm the correct platform head is installed according to specifications
- Inspect the display for dim or dead pixels, replacing any compromised sections to maintain clear visibility
- Confirm full functionality of all buttons and knobs, ensuring accurate input response
- Verify that touch, pulse, and continuous modes operate fully and as intended
- Inspect all internal wiring for breakages, tears, or wear, replacing any underperforming components to ensure reliability
- Disassemble and thoroughly clean the internal casing to remove any accumulated debris
- Check that the feet are intact and confirm the vortexer is properly balanced on a flat surface
- Conduct a comprehensive cosmetic inspection to ensure all exterior surfaces meet quality standards
Technician Inspection and Recertification Checklist: Vortexer
The Following Checklist Is to Be Performed on All Incoming and Outgoing Pieces of Equipment
Task
|
Completed?
|
Remarks?
|
Verify power supply and PCB output stable, correct voltages across circuits
|
Completed
|
|
Confirm correct platform head is installed according to specifications
|
Completed
|
|
Inspect display for dim or dead pixels; replace compromised sections for clarity
|
Completed
|
|
Confirm functionality of all buttons and knobs for accurate input response
|
Completed
|
|
Verify full operation of touch, pulse, and continuous modes as intended
|
Completed
|
|
Inspect internal wiring for damage; replace underperforming components for reliability
|
Completed
|
|
Disassemble and clean internal casing to remove accumulated debris
|
Completed
|
|
Check feet for integrity and confirm vortexer is balanced on flat surface
|
Completed
|
|
Conduct comprehensive cosmetic inspection to ensure quality of exterior surfaces
|
Completed
|
|
To View More of Our Recertification Protocol Click Here
|
|
|
|
|
|
|