|
|
|
|
Thermo MaxQ 3000 Digital Orbital Shaker
Speed Range
40 to 400 RPM
Speed Increment ±Humidity Range
± 10 RPM
Timer Up to 60 minutes or Continuous
- Designed for a wide range of sample containers including flasks, vials, and Petri dishes
- Operates in diverse environments such as incubators, warm rooms, and refrigerators
- Precise speed control with a permanent magnet DC motor
- Compact dimensions of 9.7 x 25.8 x 29.4 in for efficient bench use
- Supports a humidity range of 20 to 80% for non-condensing applications
The Thermo MaxQ 3000 Orbital Shaker is ideal for shaking flasks, vials, beakers, Petri dishes, and other sample containers. Variable speed ranges and adjustable timer. Operates in temperature ranges of 0 to 40C and humidity conditions of 20 to 80% non-condensing, enabling them to be used in incubators, warm rooms, environmental chambers and refrigerators. This shaker will be fully tested to perform at factory specifications before being shipped.
The Thermo MaxQ 3000 Digital Orbital Shaker includes:
- > Platform
- > NIST Calibration and Preventative Maintenance Report
- > Power Cord
- > Operator's Manual
- > Full 180 Day Parts and Labor Warranty
Thermo MaxQ 3000 Digital Orbital Shaker Specifications
Speed Range
|
40 to 400 RPM
|
Speed Control
|
10 RPM
|
Timer
|
Up to 60 minutes or continuous
|
Dimensions (H x L x W)
|
9.7 x 25.8 x 29.4 in (24.6 x 65.5 x 74.7 cm)
|
Humidity Range
|
20 to 80%
|
Motor Type
|
Permanent Magnet DC
|
Electrical Requirements
|
120V, 50/60Hz, 1.0A, 100W
|
MaxQ 3000 ManualClick Here to View all the Technical Specs for the MaxQ 3000
- Validate that the power supply and PCB deliver stable, correct voltage outputs across all necessary connections, ensuring reliable operation
- Thoroughly inspect the display for any dim, flickering, or dead pixels; replace affected elements to maintain full readability and operational clarity
- Test the full range of button functionality, confirming responsive, accurate input recognition across all settings
- Conduct a detailed inspection of bearings and bearing housing, identifying any worn or damaged bearings, and replace as needed to prevent operational disruption
- Examine the drive belt for signs of cracking, fraying, or material breakdown; replace as required to ensure sustained performance
- Measure and adjust motor drive belt tension to optimal specifications, securing reliable and efficient power transmission
- Verify accuracy of the onboard timer, confirming proper functionality and replacing if it deviates from expected performance
- Calibrate shaker rotation speed with a NIST-traceable tachometer, validating precision within specified operational limits
- Run the shaker continuously for an 8-12 hour testing period, closely observing the shaking platform for smooth, consistent motion, while monitoring for any error indicators such as knocking, skipping, or unusual vibrations
- Perform a comprehensive cosmetic inspection to confirm the device’s exterior meets aesthetic and quality standards, free from visible damage or wear
Technician Inspection and Recertification Checklist: Shakers
The Following Checklist Is to Be Performed on All Incoming and Outgoing Pieces of Equipment
Task
|
Completed?
|
Remarks?
|
Validate stable, correct voltage outputs from power supply and PCB
|
Completed
|
|
Inspect display for dim, flickering, or dead pixels; replace as needed
|
Completed
|
|
Test button functionality for responsiveness and accuracy across all settings
|
Completed
|
|
Inspect bearings and housing for wear; replace as needed to prevent disruption
|
Completed
|
|
Examine drive belt for cracking, fraying, or material breakdown; replace as required
|
Completed
|
|
Measure and adjust motor drive belt tension to optimal specifications
|
Completed
|
|
Verify onboard timer accuracy; replace if it deviates from expected performance
|
Completed
|
|
Calibrate shaker rotation speed using a NIST-traceable tachometer
|
Completed
|
|
Run 8-12 hour continuous test; observe platform for smooth, consistent motion
|
Completed
|
|
Perform comprehensive cosmetic inspection for quality standards compliance
|
Completed
|
|
To View More of Our Recertification Protocol Click Here
|
|
|
|
|
|
|