|
|
|
|
New Brunswick Excella E25 Incubator Shaker
Shaking Speed 50 to 400 RPM
Temperature Range
Ambient +7°C to 60°C
Chamber Dimensions (W x D x H) 33.5 in X 23 in X 19 in (85 cm X 58 cm X 48 cm ) Clearance Above Platform
- UniCentric single eccentric counterbalanced drive ensures smooth, stable shaking motion
- Proportional/Integral (PI) microprocessor controller provides precise speed control with digital feedback
- 3-digit LED display allows easy monitoring with 1 RPM increment adjustments
- Programmable timer (0.1 to 99.9 hours) with automatic shutoff or continuous operation mode
- Automatic restart retains setpoints and resumes operation after power restoration
- Visible and audible alarms notify of deviations in speed, temperature, and timer expiration
- Automatic drive-interrupt system halts motion when the cover is opened for user safety
The New Brunswick Excella E25 Incubator Shaker is a large capacity shaker that utilizes a UniCentric single eccentric counterbalanced drive to provide
horizontal plane rotary motion in a 2.54 cm (1 in) circular orbit. The proportional/Integral (PI) microprocessor controller with instantaneous digital feedback controls the speed over a range of 50-400 rpm. The shaker also features a timed mode via a programmable timer for shaking periods of 0.1 hr. to 99.9 hrs.
All of our equipment will be fully tested to perform at factory specifications before being shipped.
The New Brunswick Excella E25 Incubator Shaker includes:
- > NIST Calibration and Preventative Maintenance Report
- > Power Cord
- > Operator's Guide
- > Full 180 Day Parts and Labor Warranty
New Brunswick Excella E25 Incubator Shaker Specifications
Shaking Speed
|
50 to 400 RPM
|
Speed Control
Accuracy
|
1 RPM
|
Speed
Indication
|
3-digit LED,
displayed in 1 rpm increments
|
Shaking
Stroke/Orbit
|
2.54cm (1in)
|
Temperature
Ambient* Operating
Environment
|
10 - 35C, 20
to 80% relative humidity, non-condensing
|
Refrigerant
|
R-134A
|
Alarms
|
Visible and
audible warning indication when speed deviates more than 5 rpm, and
temperature more than 1C from setpoints, and when timer has expired.
|
Timer
|
0.1 to 99.9
hours. Shuts off agitation at end of period. Can be deactivated for
continuous operation.
|
Automatic
Restart
|
Automatic
restart after power is restored. Setpoints and operating status are retained
in memory during power interruption.
|
Drive
Interrupt
|
Automatic
drive-interrupt when cover is opened.
|
Electrical
Requirements
|
110/120 VAC,
50/60 Hz
220/240 VAC,
50/60 Hz
|
Platform
|
76 X 46 cm
(30 X 18 in)
|
Overall
Dimensions (W x D x H)
|
127 cm X 77
cm X 85 cm (50 in X 30.5 in X 41.7 in)
|
Chamber
Dimensions (W x D x H)
|
85 cm X 58 cm
X 48 cm clearance above platform (33.5 in X 23 in X 19 in)
|
Weight
|
204.5 kg (450
lb)
|
- Examine the chamber glass for cracks or chips, replacing it as needed to maintain structural integrity.
- Inspect door seals for signs of wear or damage, replacing them to ensure a tight seal.
- Check the display for brightness and clarity, replacing any dim or dead pixels to maintain optimal visibility.
- Test all buttons to confirm full functionality and consistent responsiveness.
- Replace all platform assembly bearings to ensure smooth and reliable motion.
- Inspect the drive belt for wear, replacing it if torn or cracked to maintain performance.
- Examine all wiring for frays, tears, or breakages, addressing any issues for electrical safety.
- Verify each PCB test point, replacing any malfunctioning components to ensure system reliability.
- Check drive belt tension to confirm correct alignment and function.
- Confirm the compressor’s operation, cleaning condenser filter and fins for efficient cooling.
- Calibrate internal temperature accuracy using an NIST-traceable temperature probe.
- Measure and calibrate platform RPMs with an NIST-traceable tachometer to ensure precision.
- Conduct a final cosmetic inspection to verify all surfaces meet appearance standards.
Technician Inspection and Recertification Checklist
The Following Checklist Is to Be Performed on All Incoming and Outgoing Equipment
Task |
Completed? |
Remarks? |
Examine chamber glass for cracks or chips, replace as needed | Completed | |
Inspect door seals for wear, replace to ensure tight seal | Completed | |
Check display brightness, replace dim or dead pixels | Completed | |
Test all buttons for full functionality and responsiveness | Completed | |
Replace platform assembly bearings for reliable motion | Completed | |
Inspect drive belt for wear, replace if torn or cracked | Completed | |
Examine wiring for frays or breakages, repair as needed | Completed | |
Verify PCB test points, replace faulty components | Completed | |
Check drive belt tension for proper alignment | Completed | |
Confirm compressor functionality, clean filter and fins | Completed | |
Calibrate internal temperature with NIST probe | Completed | |
Calibrate platform RPM with NIST-traceable tachometer | Completed | |
Conduct cosmetic inspection for appearance standards | Completed | |
To View More of Our Recertification Protocol Click Here
|
|
|
|
|
|
|