|
|
|
|
Labconco 7320020 RapidVap Vertex Dry Evaporator, 115V, 60Hz
The Labconco 7320020 RapidVap Vertex Dry Evaporator speeds evaporation of up to 50 samples at the same time using dry heat and nitrogen blow down. A convenient touchpad allows easy programming of time and temperature. Up to ten different programs may be stored in the microprocessor for protocol consistency. Unlike water bath heaters, the dry block heater requires less maintenance, no distilled water or additives, and adds no potential source of contamination. The RapidVap Vertex Evaporator is ideal for preparation of samples in a variety of applications including drug discovery, clinical analysis, environmental testing, agrochemistry, and forensic evidence processing.
This unit is in excellent condition, and all of our equipment is fully tested to perform at factory specifications before being shipped.
The Labconco 7320020 RapidVap Vertex Dry Evaporator, 115V, 60Hz includes:
- > Power Cord
- > Operator's Guide
- > Full 180 Day Parts and Labor Warranty
Labconco 7320020 RapidVap Vertex Dry Evaporator Specifications
Electrical
|
115V 60Hz
|
Dimensions
|
20.4w x
11.2d x 13h
51 x 28 x 33 cm
|
Certifications/Compliance
|
ETL, ETL-C
|
Includes
|
Temperature
probe, built-in exhaust fan with blower
|
Pressure
Range
|
0 to 3.1
|
Weight
|
35 lb.
(15.9kg)
|
Plug Type
|
NEMA 5-15P
|
Wattage
|
900w
|
Amperage
|
8A
|
Material
|
Epoxy coated
Steel
|
Display
|
LCD
|
Run Time
|
1 to 999 min.
|
Total Count
|
50.0
|
Labconco RapidVap Vertex Manual
- Verify internal power supply output for correct voltage to ensure stable and accurate performance
- Confirm fuse holder is secured firmly, preventing movement or disconnection
- Inspect glass window for any cracks or chips, maintaining structural integrity and visibility
- Assess power-up diagnostics, display, and push wheel buttons for full functionality
- Ensure pressure gauge and regulator are operating accurately and within specified ranges
- Test and align all nozzle manifolds, clearing any blockages to optimize spray performance
- Check all tubing for leaks, confirming secure attachment to manifolds to prevent pressure loss
- Verify all control panel connections are secure, with no frayed or torn wiring that could impact safety
- Confirm fan operation to maintain appropriate internal cooling, replacing if performance is inadequate
- Test evaporative cooling functionality, ensuring performance below ambient temperature
- Test heating bath accuracy, confirming precise temperature alignment with set points
- Verify PSI stability, confirming that pressure is steady and adjustable as needed
- Ensure cosmetic condition is within standards, free from damage impacting function or appearance
Technician Inspection and Recertification Checklist: Blowdown Evaporators
The Following Checklist Is to Be Performed on All Incoming and Outgoing Equipment
Task
|
Completed?
|
Remarks?
|
Verify internal power supply output voltage
|
Completed
|
|
Confirm fuse holder is secured
|
Completed
|
|
Inspect glass window for cracks or chips
|
Completed
|
|
Assess power-up diagnostics, display, and push wheel buttons
|
Completed
|
|
Ensure pressure gauge and regulator functionality
|
Completed
|
|
Test and align all nozzle manifolds, clear blockages
|
Completed
|
|
Check tubing for leaks and secure attachment to manifolds
|
Completed
|
|
Verify secure control panel connections and check wiring
|
Completed
|
|
Confirm fan operation, replace if needed
|
Completed
|
|
Test evaporative cooling below ambient temperature
|
Completed
|
|
Confirm heating bath temperature accuracy
|
Completed
|
|
Verify PSI stability and adjustability
|
Completed
|
|
Ensure cosmetic condition meets standards
|
Completed
|
|
To View More of Our Recertification Protocol Click Here
|
|
|
|
|
|
|