|
|
|
|
Genevac EZ-2 Plus Evaporating System
The Genevac EZ-2 Plus Evaporating System with an internal vacuum pump is in excellent condition. Using the most advanced proven technology available in evaporation science, the Genevac EZ-2 Plus is designed specifically for solvent removal whether concentration of samples or complete drying is required. This all-in-one design offers great performance and is easier to use than a rotary evaporator. This concentrator assures consistently great results with total sample protection, preventing bumping and overheating of delicate samples with smooth and fast evaporation. The EZ-2 Plus is recommended for solvents with boiling points up to 165°C.
Applications include clinical and diagnostic testing, DNA and oligonucleotides, environmental analysis, food and beverage, metabolism and toxicology studies, natural products research, parallel chemistry, proteins and peptides, post purification sample handling, and oils, fuels, and fats.
All of our equipment is fully tested to perform at factory
specifications before being shipped.
The Genevac EZ-2 Plus Evaporating System includes:
- > Swing Bucket Rotor
- > Buckets with Microplate Adapters
- > Power Cord
- > Glassware
- > Internal Vacuum Pump
- > Full 180 Day Parts and Labor Warranty
Genevac EZ-2 Plus Evaporating System Specifications
Max RPM
|
2000
|
Max G
|
500
|
Drive System
|
Direct
|
Max Sample Load (including swings)
|
1.5 kg
|
Max Imbalance
|
40 g
|
IR Lamps (number)
|
1
|
Dimensions (W x D x H)
|
59.7 x 64.5 x 70 cm
|
Vacuum System
|
Pressure Display
|
0 – 1200 mbar
|
Pressure Control
|
Automatic, 2 mbar – atmosphere
|
System Ultimate Pressure
|
2 mbar
|
Temperature Controls
|
Temperature Control Range
|
Ambient to 80
°C
|
Temperature Control Accuracy
|
±2.5°C
|
Temperature Sensing
|
By
SampleShield infrared pyrometer
|
Temperature Display Range
|
0°
to 80°C
|
Condenser Data
|
Condenser Temperature
|
Minimum
-50°C; Nominal operating temperature -35°C
|
Condenser Power
|
70
Watts max load
|
Usable Capacity – Vacuum Pot
|
1
L
|
- Inspect the display panel, replacing any dim or dead pixels to ensure clear visual feedback
- Verify full functionality of all buttons, confirming consistent responsiveness
- Examine the acrylic or glass lid for any cracks or chips, ensuring safety and integrity
- Check the vacuum chamber seal for any tears or cracks that could impact pressure retention
- Test chamber lid functionality, confirming all micro switches report a consistent .04 Ohms
- Verify external connections to the pump or cold trap, ensuring they are properly sealed and leak-free
- Inspect and clean the internal fan and condenser (if applicable) for efficient cooling and airflow
- Examine all internal wiring for frays or breakages, confirming secure and intact connections
- Test motor functionality, replacing motor or bearings if performance is compromised
- Inspect internal pump seals, replacing any worn or damaged seals to maintain vacuum integrity
- Inspect all internal hoses for potential leaks, ensuring tight, clean seals
- Confirm unit is capable of achieving all manufacturer-specified temperature ranges
- Verify the unit can reach specified vacuum levels in accordance with manufacturer standards
- Conduct a 6-8 hour cycle test to confirm consistent operational performance
Technician Inspection and Recertification Checklist: Centrifugal Evaporators
The Following Checklist Is to Be Performed on All Incoming and Outgoing Equipment
Task
|
Completed?
|
Remarks?
|
Inspect display panel for dim or dead pixels
|
Completed
|
|
Confirm functionality of all buttons
|
Completed
|
|
Check acrylic/glass lid for cracks or chips
|
Completed
|
|
Inspect vacuum chamber seal for tears or cracks
|
Completed
|
|
Confirm chamber lid micro switches report .04 Ohms
|
Completed
|
|
Verify pump or cold trap connections are sealed and leak-free
|
Completed
|
|
Inspect and clean internal fan and condenser (if applicable)
|
Completed
|
|
Inspect internal wiring for frays or breakages
|
Completed
|
|
Test motor functionality, replace motor/bearings if needed
|
Completed
|
|
Inspect internal pump seals, replace if needed
|
Completed
|
|
Inspect all internal hoses for leaks, ensure clean seals
|
Completed
|
|
Confirm unit achieves specified temperature ranges
|
Completed
|
|
Verify unit reaches specified vacuum levels
|
Completed
|
|
Conduct a 6-8 hour cycle test for operational performance
|
Completed
|
|
To View More of Our Recertification Protocol Click Here
|
|
|
|
|
|
|